Project Catagories

Project Archive

Surge Vessel Refurbishment
Stonbury's Surge Vessel Refurbishment Services

Cleaning and Chlorination Services
Stonbury have been involved in cleaning and chlorinating service reservoirs for over 25 years. This was initially as part of refurbishment schemes ensuring that at the end of the works the reservoir was ready to go back into service.

Sustainable Approach To Steel Coating Projects
A guide to how Stonbury use environmental considerations for steel coating projects.

Refurbishment Of Surge Vessel
Fabrication and installation of new manway and recoating of internal services.

Service Reservoir Refurbishment
Refurbishment bought this reservoir back into action after being taken out of service in 1990.

Sutainability News - Surge Vessel Refurbishment
The Stonbury way !!!

Sustainability News - Wilford Suspension Bridge
Wilford Suspension Bridge - The sustainable approach !!!

Sustainability News
Stonbury defines sustainability for its business !!!

Wilford Suspension Bridge
Refurbishment of Suspension Bridge

River Elwy Pipe Bridge
Refurbishment of Pipe Bridge

Wollaston Water Tower
Repair and Coating Works

Stokesley Town Bridge
Painting Works

Horsley Cross Water Tower
Refurbishment to Tower and Roof

Flat Roof and Wall Refurbishment
Re-cover a flat roof, including the walls rising above the roof and a gable wall to one side.

Power Station Culverts
Work undertaken to Power Station Culverts.

University Roofing
Insulating and Waterproofing of a Roof on a University Campus.

Cladding to Abattoir Gable
Replacement of gable end cladding to include safe removal of existing system and a quick turn around to ensure minimal disruption.

Re-Roofing of 4-Storey Block
Re-roofing of an existing asphalt rook to an office block.

Extension to Pump House
Application of a sinlge-ply PVC roof to Pump House extension.

Roof Insulation and Waterproofing at University Campus
Preparation, Insulation and Waterproofing of a University campus roof.

Steel Bridge Painting
Stonbury Steel Coatings Division recently undertook the painting contract to all the steelwork on this important structure.

Diesel Tanks and Bund Areas
Improving and extending the life of diesel tanks and bunds to a number of water treatment works.

Camisky Reservoir
Preparation and coatings to internal and external surfaces.

Reservoir Shafts and Tunnels
Survey, design and installation of ladders and walkways etc.

Surge Vessels
Internal and External refurbishment Programme.

Thirlmere Aqueduct 2007
Refurbishment of five pipe bridge crossings and two conduits.

Thirlmere Aqueduct Conduit Bridges
Internal Waterproofing to Conduit Bridges.

Water Tower Structural Strengthening and Refurbishment
Refurbishment of Concrete Water Tower including Structural Strengthening of Water Tower Roof.

Waterproofing Valve House Roofs - Reservoir Site
Preparation and application of Waterproofing system to five valve house roofs.

Stoke Bardolph STW
Internal Repairs and Coatings.

Home | About Us | Quality, Environment and Safety | Water | Power | Local Authority | Training | Projects | Contact | Terms & Conditions | Privacy Policy