*** Covid-19 Update ***

Stonbury are immensely proud to be supporting our clients across the UK at such a crucial time and have been designated as 'key workers' by DEFRA and the UK water utility companies. Our teams are working tirelessly to help secure and maintain drinking water supplies, ensuring clean and safe drinking water is provided without interruption to critical services such as our hospitals as well as the general public. Now more than ever, the safety and wellbeing of our staff is of the utmost importance and we have adapted our safe working practices to ensure social distancing precautions are in place and that the correct hygiene practices are being followed. Safety is our priority, and we endeavour to make sure everyone at Stonbury goes home safe to their family.

// Embankment and flood wall repairs

Stonbury were recently contracted to repair damage caused by badgers under-mining the tidal embankment and flood wall at a popular holiday resort on the coast.

Working with an expert in badger exclusion and relocation, an artificial sett was constructed away from the damaged site, and upon receipt of the appropriate licence, a 21-day exclusion programme was instigated. The programme included the installation of one-way gates across all entrances to the existing sett, allowing the badgers to exit the sett but not get back in.

The badgers were successfully encouraged to relocate to the new artificial sett during this period and mesh was placed over the whole embankment to prevent the badgers from excavating new entrances back into the original sett.

A geo-polymer resin system was injected into the voids below the structure via a series of small holes that had been drilled through the concrete. The resin spread and expanded into the voids, following the path of least resistance until the space was filled.

Due to the fast setting time of the geo-polymer and the accurate positioning of the injection holes, the structure was lifted and rotated back to its original position with a very high level of accuracy.

For this project, the injected geo-polymer system offered distinct advantages over more traditional remediation methods as it was quicker and less disruptive than the use of piling or underpinning, which was not an option as the noise would have been an issue for both the badgers and locals/tourists.

Once the re-profiling works to the embankment were completed, the site was successfully handed back to the client.

Download a PDF of this project